SS400 is a low carbon steel with no specified carbon content. According to its mechanical properties, it is similar to S690QL1 ASTM equivalent ASTM A36, which is widely used in engineering and industrial applications. The cost of JIS SS400 steel angle steel structure is low, and it has good performance in major projects. SS400 angle steel description:Item: SS400 angle steel. S690QL1 ASTM equivalent Standard: JIS G3101-2004. Technology: hot rolled. Type: equal & unequal. Surface: black or galvanized. Length: 6 m, 9 m, 12 m or per your request. Equal angle: Size: 20 × 20 mm to 200 × 200 mm. Thickness: 3 to 20 mm. Length: 6 m, 9 m, 12 m or per your request. Unequal angle: Size: 30 × 20 mm to 250 × 90 mm. S690QL1 ASTM equivalent Thickness: 3 to 10 mm. Length: 6 m, 9 m, 12 m or per your request.
Medium and heavy plate S690QL1 ASTM equivalent inventory spot: 23*3190*9220, 23*2470*8400, 22.5*3050*7300, 23*3500*10800, 21*3500*8840, 22*3400*11550, 29.5*1750*7150, 25*2500*12000, 27*1500*5000, 36*2720*7950, 27*1920*6000, 25*2630*3300, 26*3480*6000, 27*1800*6000, 23*2430*12370, 22.5*2560*6000, 43.5*1600*6000, 28.5*2500*6700, 32*1850*6000, 27.5*3100*6390, 48.5*1600*6000, 23.5*3300*14000, 33*3500*7050, 50*1600*6000.
Heat treatment process: heat treatment refers to a kind of process operation in which the metal or alloy can change the internal structure through certain heating, heat preservation and cooling methods in the solid range to obtain the required performance. S690QL1 ASTM equivalent Heat treatment process refers to the ability to change the microstructure and properties of S690QL1 ASTM equivalent after heat treatment, including hardenability, hardenability, temper brittleness, etc.
Rizhao Steel 5#ESP Headless Strip Production Line Project is a key construction project in Shandong Province. It is also the fifth domestic ESP production line introduced by Rizhao Steel and the sixth ESP production line in the world. Its thinnest design is 0.5mm, which is at the world's leading level. The more than 20 important nodes set by the entire project have been basically completed, and the equipment has entered the commissioning stage. It is expected to be put into operation at the end of November.