SA299 Gr.B steel is C-Mn-Si steel plate often used to make various welding parts whose working temperature does not exceed 400 degrees Celsius, such as the head and shell of boiler steam drum, pressure vessel. Due to its working environment, SA299 Gr.B plate is required to have a higher medium temperature, outstanding shaping and heat treatment process functions, and outstanding welding functions.
Strip steel is a kind of steel plate with thin thickness, narrow width and long length. Strip steel can be made of common carbon steel, carbon structural steel, spring steel, tool steel, stainless steel, etc. Strip steel has the advantages of high dimensional accuracy, good surface quality, easy processing and material saving. There are many kinds of strip steel, EN S275M steel. Hot rolled steel strip is mainly used for cold-rolled billets, cold-formed steel billets, welded steel pipe billets, manufacture of bicycles and small hardware products.
Medium and thick steel plates are widely used in construction engineering, machinery manufacturing, container manufacturing, shipbuilding, bridge construction and so on. However, each project has different requirements for plate size. How to cut EN S275M steel, medium and thick steel plates? There are many ways, for example, flame cutting, laser cutting, wire cutting, plasma cutting, ultra-high pressure water cutting and so on.
We are the professional Chinese steel plate, steel pipe supplier. If you need any steel plate, steel pipe, we can put the steel plate, steel pipe order to our steel mill directly or collect these goods from our stock directly if we have enough ex-stock. Besides. if you need any EN S275M steel offer or if you want to know the price and any other information about steel plate, steel pipe price, please be free to contact us.
When providing technical services on site, the after-sales personnel shall strictly abide by the safety rules and regulations of the construction site, consciously take safety protection measures (such as wearing safety helmet when entering the construction site), accept the supervision and management of the site; without permission on the construction site, they shall not dismantle, smear or damage any goods; the commissioning of contract goods shall be carried out under the supervision of the site supervisor If necessary, it shall be approved by the site supervisor or the person in charge of the project department.